Finishing the hotel and the lighthouses
Friday, November 23, 2012 at 2:08PM
Dave

After dinner boredom sets in. It’s too cold to go out so I got back to work.

the lighthouses are very near completion. I will say that even though they are similar in design the O and HO versions are very different in proportion.

The hotel is also complete but for the exterior fire escape railings and the side building. I am planning to have both of these complete by the weekend. (I’ll post some rough pix as well)

Chama is down to the fiddely bits. I may be asking folks to do some bent wire for the skip tracks. Thats whats holding me up.

 

Article originally appeared on Clever Models Paper Models for the 21st Century (http://clevermodels.com/).
See website for complete article licensing information.